Reconstruction of C2 monoblock

 


  • Location: ON Kladno
  • Client: DOMY s.r.o.
  • nvestment costs: CZK 8362000
  • Project scope: air-handling system, cooling
  • Project completion: 2017

 

The project deals with forced ventilation and cooling of the reconstructed C2 monoblock where the following operations are concentrated: JIP, operation room, examination rooms, care bed rooms, laboratories.

CAR WHEELS MANUFACTURING PLANT – W15 – newly built paint shop


  • Location: Ronal Jičín
  • Client: ARCHaPLAN s.r.o.
  • Investment costs: CZK 19715000
  • Project scope: air-handling system, cooling
  • Project completion: 2017

 

The project was aimed at air-handling and air-conditioning systems in the Ronal W15 manufacturing plant in Jiřín. The final solution includes air-handling units for ventilation, cooling and heating of manufacturing premises, cloakroom premises, warehouse premises, workshops, offices and meeting room. 

Commercial and administrative complex – Raaltrans


  • Location: Hradec Králové
  • Client: Žídek Raaltrans
  • Investment costs: CZK 39000000
  • Project scope: air-handling system, cooling
  • Project completion: 2016

 

The project covered forced ventilation of selected premises in the administrative building (meeting room, reception desk), negative pressure ventilation of social facilities and complete cooling in offices (VRV system).

Warehouse hall with administrative section – Greenhouse DC3


  • Location: Hradec Králové – Březhrad
  • Client: BAK a. s.
  • Investment costs: CZK 8920000
  • Project scope: air-handling system, cooling
  • Project completion: 2016

 

The project was focused on ventilation, heating and cooling of the warehouse hall, as well as ventilation and air-conditioning of the administrative building.

LEGO KLADNO-FUTURE


  • Location: Kladno-Kročehlavy
  • Client: Sater projekt s.r.o.
  • Investment costs: CZK 49800000
  • Project scope: CHL
  • Project completion: 2011

 

The design works included complete project for cooling including 3MW source of cooling. Production site covers warehousing premises, administrative buildings and assembly lines.

Rest home and subsequent-care beds


  • Location: ON Kladno
  • Client: DOMY, s.r.o.
  • Project scope: air-handling system, cooling
  • Project completion: 2010

 

The newly erected building of the rest home is designed as a four-floor building with basement in the part of it. The function of the building is mainly focused on permanent stay of patients with rehabilitation needs in close combination with the bed section and the outpatient treatment section. The commercial section dedicated to rehabilitation on the 1st above-ground floor comprises of the lymph therapy and the gym. The non-commercial section has the entry hall used as a waiting room by patients, directly connected to examination rooms, electrotherapy (magnetotherapy), ergotherapy, rehabilitation management rooms, workrooms and cloakrooms for rehabilitation staff. Indirectly – through central cloakroom – the individual training rooms, hydro therapy and gym may be accessed.

KEYSTON polyfunctional object


  • Location: Prague
  • Client: AED project, a.s.
  • Project scope: air-handling system, cooling
  • Project completion: 2010

 

The new administrative building with commercial areas and underground garage.