References - Projects

RONAL W17 manufacturing site – Annex building and adaptations of SO 01 object


  • Location: Pardubice
  • Client: Ronal ČR s.r.o.
  • Project scope: air-handling system, measurement and regulation
  • Project completion: 2017

 

We got an opportunity to cooperate on the project of gradual modernization and extension of the existing manufacturing premises of the manufacturing site of one of the leading manufacturers of light alloy cast wheels for passenger cars located in Pardubice, by assuring the supplies and works for air-handling and measurement & regulation professions.

Building adaptations of J hall in the PETROF company site


  • Location: Hradec Králové
  • Client: Stating s.r.o.
  • Project scope: air-handling system including air-conditioning
  • Project completion: 2017

 

It is a great honor for our company to partake in the development of the new cultural center of the world renown producer of pianos, the heart of that will be one of the largest and most modern showrooms in Central Europe. A part of the project is also a stylish cafeteria and a multifunctional hall.

RONAL W15 manufacturing site – New building of painting shop SO 17


  • Location: Jičín
  • Client: Syner, s.r.o.
  • Project scope: air-handling system including air-conditioning
  • Project completion: 2017

 

In connection with the implementation of project of extension of the existing manufacturing capacities of the production site of one of the leading manufacturers of light alloy cast wheels for passenger cars located in Jičín, our company got an opportunity to assure the supply of air-handling system. In this connection we also prepared all levels of the project documentation for this profession.

Administrative building of Raaltrans a.s.


  • Location: Hradec Králové
  • Client: Prima spol. s r.o.
  • Project scope: air-handling system including air-conditioning
  • Project completion: 2017

 

At first our company drafted project documentation for air-handling system and then it was entrusted with its implementation in the newly developed administrative building of one of the leading European providers of traffic information in the field of goods logistics and forwarding.

Greenhouse logistic center development


  • Location: Březhrad
  • Client: BAK stavební společnost, a.s.
  • Project scope: air-handling system including air-conditioning, source of cooling
  • Project completion: 2017

 

Based on the direct contact by HOYA a.s. as the investor of the project, requesting the preparation of alternative project for the forced ventilation and air-conditioning of the planned site, our company had an opportunity to partake in the development of this logistic and administrative center with a total area of 20000 square meters, initially operated by Ahold chain.

Residential complex KOTI – Hyacint, Phase II


  • Location: Praha
  • Client: Průmstav, a.s.
  • Project scope: air-handling system including air-conditioning
  • Project completion: 2016

 

During 2015 and 2016, for the developer Průmstav, a.s., also a member of Vinci Group, we took care of the air-handling profession for the second phase of the development of the residential complex at Modřany, Prague, comprising of three objects (A, B and C) and shared underground garage. The complex offers 165 residential units and 8 commercial units on the basement floor of object A, as well as 173 parking places.

Reconstruction of the Gallery of Modern Art


  • Location: Hradec Králové
  • Client: Stako spol. s r.o.
  • Project scope: air-handling system, air-conditioning
  • Project completion: 2016

 

Within the reconstruction of the historically protected building situated in Large Square in the very centre of Hradec Králové, our company provided supplies and all the works associated with forced ventilation and air-conditioning of the relevant premises. The unique design of the ventilation of gallery (see photo) is considered as the dominant of the exhibition premises. The purpose of the graphical design was to merge the installation into the gallery space including the items exhibited.

Administrative center of the Hradec Králové Region – extension of cooling


  • Location: Hradec Králové
  • Client: Správa nemovitostí Královéhradeckého kraje a.s.
  • Project scope: cooling, sanitary installations, electrical installations, measurement and regulation, building works
  • Project completion: 2016

 

Our company provided supplies and works associated with the extension of cooling to the remaining office premises in the building. Besides the cooling profession, the project also included all the other related professions which were realized by us on a turn-key basis. This project was a true challenge as we had to implement it under full operation so we were forced to adapt the works accordingly.

Faculty Hospital Hradec Králové – Department of Nuclear Medicine


  • Location: Hradec Králové
  • Client: Prima spol. s r.o.
  • Project scope: air-conditioning of clean premises incl. the service line for cooling and central heating
  • Project completion: 2014

 

In the second half of 2014 our company was involved in the implementation of the above mentioned deliveries and works within the scope of the integration project of clean premises for the preparation of radiopharmaceuticals into the existing premises of the Department of Nuclear Medicine, the Oncology Clinic building, Faculty Hospital Hradec Králové.

Karlín Hall 2, nowadays FÓRUM Karlín


  • Location: Praha
  • Client: Průmstav, a.s.
  • Project scope: air-handling system including air-conditioning, heat and smoke extraction
  • Project completion: 2014

 

Our company was a member of a wide realization team during the construction of this complex, the heart of which is the multifunctional area with the capacity for 3000 people intended for organizing cultural, social and professional events. The complex includes the eight-storey building with 9500 square meters of modern office spaces incl. extensive outdoor terraces.

Revitalization of infrastructure – Faculty of Pharmacy, Charles University in Hradec Králové


  • Location: Hradec Králové
  • Client: Prima spol. s r.o.
  • Project scope: air-handling system including air-conditioning, water cooling
  • Project completion: 2014

 

Our company, as the chief designer, was responsible for elaborating complete implementing documentation of the entire project. The project documentation for air-handling and cooling professions was also drafted by our company and afterwards successfully implemented.

KEYSTONE polyfunctional building


  • Location: Praha 8
  • Client: Průmstav, a.s.
  • Project scope: air-handling system including air-conditioning
  • Project completion: 2012

 

We were also engaged in the development of the new dominant of the Karlín quarter in Prague, inspired by Czech cubism, comprising of three underground and eight above-ground floors, particularly by realizing the air handling technological set including the preparation of project implementing documents.

Regional Hospital – Rest Home and Subsequent-Care Beds


  • Location: Kladno
  • Client: Energie – stavební a báňská, a.s.
  • Project scope: air-handling system including air-conditioning, water cooling
  • Project completion: 2012

 

Within the scope of gradual reconstruction of the Kladno hospital, our company was selected as the supplier of air handling and cooling systems for the newly erected building of the rest home incl. subsequent-care beds. We also prepared project implementing documents for the professions supplied.