Supply and Assembly

introduction

3

Within the scope of complete project realization, our company is mainly focused on complex deliveries in the field of air handling systems, air conditionings and the related professions such as machinery cooling, central heating, measurement and regulation. An integral part of deliveries and works provided are the complex tests including regulation, adjustment and putting the system into trial or permanent operation. If required by the end user, we are able to provide warranty and after-warranty servicing through our dedicated service department.

The assembly of air handling and air conditioning systems is performed exclusively by our trained and skilled staff. In case of larger projects and with regard to related professions, we cooperate with proven external subcontractors.

The complete projects realized by our company may be divided into the following groups:

  • civic amenities (residential and commercial buildings, hotels, schools, sports facilities etc.)
  • administrative facilities (administrative buildings, saving banks, banks public administration buildings etc.)
  • industry (production and storage halls etc.)
  • health care (hospitals, drugstores, laboratories etc.)

See the Reference section for detailed information on the past projects.

references

gmu_hk_foto_(c)_tomas_maly_MG_6429-HDR

  • Project name: Reconstruction of The Gallery of modern art
  • Location: Hradec Králové
  • Client: Stako spl. s r.o.
  • Project costs: 2,9 mil. CZK
  • Project scope: air handling
  • Project completed: 2016

We supplied and mounted air ventilation during the complete reconstruction of the historically protected building of The Gallery of Modern Art on the Large square in the very centre of Hradec Kralove.

 

karlin_hall

  • Project name: Karlín Hall 2, nowadays FÓRUM Praha
  • Location: Praha
  • Client: Průmstav, a.s.
  • Project costs: 29 mil. CZK
  • Project scope: air handling, heat and smoke exhaust
  • Project completed: 2014

 Our company was a member of wide realization team during the construction of this complex, whose heart is multi functional area with the capacity for 3000 people intended for organizing cultural, social and professional events.  Integral part is also eight-storeys building with space  9500 m2 of modern office spaces incl. extensive outdoor terraces.

ff_hk

  • Project name: Revitalization of infrastructure – Faculty of Pharmacy in Hradec Králové (Charles University)
  • Location: Hradec Králové
  • Client: Prima spol. s r.o.
  • Project costs: 14 mil. CZK
  • Project scope: air handling, cooling
  • Project completed: 2014

 Our compeny from a position of chief designer was responsible for elaborating complete implementing documentation of the whole project. The project documentation for  air handling and cooling was worked out by our company too and afterwards succesfully implemented.

13a

  • Project name: Administrative center of the Hradec Králové region
  • Location: Hradec Králové
  • Client: Skanska, a.s. + BAK stavební společnost, a.s.
  • Project costs: 31 mil. Kč
  • Project scope: air handling, cooling, measurement and regulation
  • Project completed: 2007

Within the scope of the reconstruction of the premises of former brewery to the regional authority building, our company was selected as the supplier of air handling system, cooling system and also the measurement and regulation system. Moreover the realization of air handling and cooling systems was based on project documents prepared by us.

 

13b

  • Project name: Polyfunctional building U Hájků II
  • Location: Praha 1
  • Client: FCC – První česká projekční a stavební a.s.
  • Project costs: 70 mil. Kč
  • Project scope: air handling, cooling, central heating, measurement and regulation, sanitary installations, heat and smoke exhaust
  • Project completed: 2009

The project of the polyfunctional building comprising mainly of the newly erected section and partially also of the reconstruction of the existing building at Na Florenci street, represents – considering the complexity of deliveries and professions supplied by us – the biggest project in the history of our company.

 

13c

  • Project name: Hotel JURYS INN
  • Location: Praha 8
  • Client: Vinci Construction Grands Projets, s.a.s.
  • Project costs: 42 mil. Kč
  • Project scope: air handling system, cooling, central heating, measurement and regulation, sanitary installations, heat and smoke exhaust, sprinklers
  • Project completed: 2009

Within the scope of erection of the hotel at Sokolská street our company provided complex supply of the above mentioned professions for the foreign client (France). A part of the contract was also the finishing of the project implementation documents for all professions delivered.

13d

  • Project name: General University Hospital – reconstruction of operating theatres and intensive care unit
  • Location: Praha 2
  • Client: BAK stavební společnost, a.s.
  • Project costs: 14 mil. Kč
  • Project scope: air handling, cooling
  • Project completed: 2009

Our company was engaged in the reconstruction of operating theatres and the intensive care unit at 1st Surgery Clinics on 3rd and 4th above-ground floors by supplying the air handling and cooling systems.

13e

  • Project name: Bus terminal
  • Location: Hradec Králové
  • Client: STRABAG, a.s.
  • Project costs: 9 mil. Kč
  • Project scope: air handling
  • Project completed: 2007

Within the scope of the development of new bus terminal our company was chosen as the supplier of air handling system including the air-conditioning technology.

13f

  • Project name: Universal hospital – Emergency – KARIM clinic
  • Location: Hradec Králové
  • Client: Geosan Group, a.s.
  • Project costs: 11 mil. Kč
  • Project scope: air handling, cooling
  • Project completed: 2008

Preparation of project implementation documents for air handling and cooling systems followed by realization of the same within the scope of the development of new emergency pavilion in the University Hospital at Hradec Králové

13g

  • Project name: Foundry KASI
  • Location: Nový Bydžov
  • Client: KASI, spol. s r.o.
  • Project costs: 4 mil. Kč
  • Project scope: air handling
  • Project completed: 2011

Our company supplied the leading Czech manufacturer of sewer cast-iron components with air handling system for its newly erected foundry in Zábědov at Nový Bydžov.

13h

  • Project name: CUTISIN, s.r.o. – Drawing facility 3, lines 3H, 3I and 3J
  • Location: Jilemnice
  • Client: CUTISIN, s.r.o.
  • Project costs: 10 mil. Kč
  • Project scope: air handling (technological)
  • Project completed: 2010

One of the major projects within the scope of our long-term cooperation with the Czech branch of the global manufacturer and seller of artificial collagen and plastic casings for meat, poultry and dairy products was the realization of air handling system (incl. steel construction) and assembly of technology for three production lines in the drawing facility 3.

13i

  • Project name: Regional Hospital –  Rest home and subsequent-care beds
  • Location: Kladno
  • Client: Energie – stavební a báňská, a.s.
  • Project costs:  5 mil. Kč
  • Project scope: air handling, cooling
  • Project completed: 2012

Within the scope of gradual reconstruction of the Kladno hospital, our company was selected as the supplier of air handling and cooling systems for the newly erected building of the rest home incl. subsequent-care beds. We also prepared project implementation documents for the professions supplied.

13j

  • Project name: Polyfunctional building KEYSTONE
  • Location: Praha 8
  • Client: Průmstav, a.s.
  • Project costs:  8 mil. Kč
  • Project scope: air handling
  • Project completed: 2012

We were also engaged in the development of the new dominant of the Karlín quarter in Prague, inspired by Czech cubism, comprising of three underground and eight above-ground floors, particularly by realizing the air handling technological set including the preparation of project implementation documents.

Latest News

kraj

 

  • Project name: Administrative center of the Hradec Kralove region
  •  Location: Hradec Kralove, Czech republic
  •  Client: Sprava nemovitosti Kralovehradeckeho kraje a.s.
  •  Project scope: cooling, measurement and regulation, electric and sanitary installations

 Currently ongoing project is related to an extension of air conditioning to the rest of offices. Besides the air conditioning itself it includes also all the related works connected to the reconstruction.